Mon-Frid 8am to 4pm
(506) 8602-6019
info@asadasurfside.com

2025-REPLACEMENT OF 450 METERS OF 100 MM PIPE-STREET-PERLAS-BASEBALL FIELD

The ASADA ensures the quality and control of the water resource; work was done on the replacement of pipes in the Perlas-Baseball Field sector, over a stretch of 600 meters, in order to provide better service to users. Additionally, this allows reinforcing the coverage of hydrants, so that they have better capacity in case of any emergency.